NEOM Subterranean Tunnels

EngineeringLat: 28.0865 | Lng: 34.9533
NEOM Subterranean Tunnels

The Challenge

Excavating and securing multi-level tunnels through varying and unpredictable rock formations.

The Solution

Deployed automated tunneling boring machines coupled with real-time geotechnical monitoring and adaptive concrete lining.

The Impact

"Completed 15km of primary infrastructure tunnels, setting a new standard for subterranean engineering."