Back to Projects
NEOM Subterranean Tunnels
EngineeringLat: 28.0865 | Lng: 34.9533
The Challenge
Excavating and securing multi-level tunnels through varying and unpredictable rock formations.
The Solution
Deployed automated tunneling boring machines coupled with real-time geotechnical monitoring and adaptive concrete lining.
The Impact
"Completed 15km of primary infrastructure tunnels, setting a new standard for subterranean engineering."